Experiment Designer

Design statistically rigorous A/B tests and interpret experiment results. Use when asked to design an experiment, run an A/B test, calculate sample size, interpret test results, or assess whether an experiment was successful. Produces a complete experiment design with hypothesis, sample size, run time, success criteria, and risk flags — or a results interpretation with ship/iterate/kill recommendation.

Published by @Mohit Aggarwal·0 agent reads / 30d·0 saves·

Experiment Designer Skill

Produce rigorous experiment designs from product hypotheses, and interpret results with statistical and practical significance — so you can defend every decision to a sceptical engineering lead or data scientist.

Required Inputs

Ask the user for these if not provided: For experiment design:

  • Hypothesis (what change, what metric, what expected movement)
  • Current baseline metric value
  • Minimum detectable effect (MDE) — the smallest lift worth caring about
  • Available daily sample size

For results interpretation:

  • Control and variant results (raw numbers or percentages)
  • P-value or confidence interval
  • Run duration (days)
  • Any anomalies observed during the test

Two-Phase Process

Phase 1: Experiment Design

  1. Restate hypothesis as: "If we [change], we expect [metric] to [move by X%] because [reason]"
  2. Define control and variant clearly
  3. Select primary metric (one only) and secondary guardrail metrics (2-3 max)
  4. Calculate required sample size from MDE and baseline
  5. Estimate run time in days
  6. Set pre-defined success criteria before the test runs — no moving goalposts
  7. Flag design risks: novelty effects, seasonal confounds, multiple testing issues, network effects, sample ratio mismatch

Phase 2: Results Interpretation

  1. Assess statistical significance (p < 0.05 threshold)
  2. Assess practical significance: was the lift meaningful for the business, not just real?
  3. Interpret confidence intervals
  4. Investigate confounding factors
  5. Recommend: Ship / Iterate / Kill / Run follow-up test
  6. Validate — Confirm the test ran for the full planned duration. Flag if it was stopped early (peeking problem). Confirm sample ratio mismatch did not occur.

Output Structure

[Design or Results header based on phase]

Hypothesis: "If we [change], we expect [metric] to [move by X%] because [reason]"

Primary metric: [One metric only] Guardrail metrics: [2-3 max] Required sample size: [n per variant] Estimated run time: [days] Pre-defined success threshold: [specific number] Design risk flags: [any concerns]

Results (Phase 2 only): Statistical significance: [p-value and conclusion] Practical significance: [lift size vs. business threshold] Recommendation: Ship / Iterate / Kill / Follow-up — [rationale]

Quality Checks

  • Hypothesis specifies the change, the metric, the direction, and the reason
  • Primary metric is singular — guardrail metrics are secondary
  • Success criteria are defined before the test launches (not after seeing results)
  • Test was not stopped early (or flagged clearly if it was)
  • Practical significance assessed separately from statistical significance
  • Sample ratio mismatch is checked in results interpretation

Anti-Patterns

  • Do not define success criteria after seeing preliminary results — post-hoc success definitions are HARKing (Hypothesising After Results are Known) and invalidate the experiment
  • Do not stop a test early because the result looks significant — early stopping dramatically inflates false positive rates; the test must run to the planned sample size
  • Do not treat statistical significance as the same as practical significance — a p < 0.05 result with a 0.1% lift is real but may not be worth shipping
  • Do not run the same experiment on the same population multiple times without correction — multiple testing inflates the chance of a false positive proportionally
  • Do not use more than one primary metric — multiple primary metrics require multiple hypothesis corrections and make the ship/kill decision ambiguous

Bundled with this artifact

1 file

Reference files that ship alongside this artifact. Agents pull these in only when the task needs them.

More on the bench

SKILL0

Sentiment Analysis

Analyze user feedback data to identify segments with sentiment scores, JTBD, and product satisfaction insights. Use when analyzing user feedback at scale, running sentiment analysis on reviews or surveys, or identifying satisfaction patterns.

product-management+1
0
SKILL0

Ab Test Planner

Design statistically rigorous A/B tests for product features, UI changes, onboarding flows, and pricing experiments. Use when asked to set up an experiment, design an A/B test, calculate sample size, or interpret test results. Produces a complete test plan with hypothesis, variant definitions, sample size, duration estimate, guardrail metrics, and a results interpretation guide.

product-management+1
0
SKILL0

Metrics Framework

Build a metrics framework for any product, team, or business. Use when asked for a metrics tree, KPI framework, North Star metric, AARRR funnel, HEART framework, or OKR metrics. Produces a structured metrics hierarchy from North Star down to leading indicators, with measurement guidance.

product-management+1
0